- Bar Round
- Bar Round Drawn
- Bar Round Ground-h6
- Bar Square
- Bar Square Drawn
- Bar Flat
- Bar Flat Drawn
- Bar Flat Key
- Bar Hexagon Drawn
- L-Profile (angle)
- T-Profile (Tee)
- U-Profile (channel)
- Tube Round
- Tube Round Ground
- Tube Seamless
- Tube Square
- Tube Square Ground
- Tube Rectangular
- Tube Rectangular Ground
- Sheet
- Sheet Ground
- Sheet Galvanized
- Sheet Perforated
- Tread Plate
- Accessories
General Terms and Conditions
General Terms and Conditions of the company MYSTEEL24 e.U.
§1 Scope of application and definition of terms
(1) The following General Terms and Conditions of Mysteel24 e.U., Flemingstr. 2, 2332 Hennersdorf, Austria, E-Mail: office@mysteel24.com apply to all orders placed in the online store www.mysteel24.com.
(2) Consumer in the sense of these terms and conditions is someone for whom the transaction is not part of the operation of his business.
§2 Conclusion of a contract
(1) In case of conclusion of a contract, the contract is concluded with
Mysteel24 e.U., FN 372018k
Flemingstr. 2
2332 Hennersdorf
Austria
e-mail: office@mysteel24.com
shall come into effect.
(2) The presentation of the goods in our internet store does not represent a legally binding contract offer on our part, but are only a non-binding invitation to the buyer to order goods. By ordering the desired goods, the Buyer submits a binding offer to conclude a purchase contract.
(3) Upon receipt of an order in our Internet store, the following provisions shall apply: The Buyer makes a binding offer to enter into a contract by successfully completing the order procedure provided in our Internet store.
The order is placed in the following steps:
1) Selection of the desired goods
2) Confirmation by clicking the "add to shopping cart" button
3) Checking the data in the shopping cart
4) pressing the button "TO CHECKOUT
5) Logging in to the Internet store after registration and entering the login data (e-mail address and password).
6) Checking the billing and delivery address
7) Pressing the button "CONTINUE
8) Select the method of payment
9) Pressing the button "CONTINUE
10) Check again or correct the respective entered data = summarizing overview of the essential content of the contract.
11) Confirmation of the terms and conditions and privacy policy
12) Binding sending of the order by clicking on the button "order with obligation to pay".
From the binding submission of the order, the Buyer can, after checking his details, return to the Internet page on which the Customer's details are recorded and correct input errors or cancel the order process by closing the Internet browser by pressing the "Back" button contained in the Internet browser used by him.
(4) We shall confirm receipt of the order immediately by means of an automatically generated e-mail. This confirmation of receipt does not constitute an acceptance of your purchase offer, but only confirms the receipt of your order. The purchase contract is only concluded if we accept your order within 3 working days after receipt by sending an order confirmation by e-mail to the e-mail address provided by the buyer.
§3 Prices, shipping costs, payment, due date
(1) The stated prices include the value added tax in the respective legal amount. In addition, shipping costs in the amount of see shipping costs table.
(2) The buyer has the option of payment by cash in advance, credit card (via Paypal) and PayPal.
(3) If the buyer has chosen payment by cash in advance or Paypal, he undertakes that the purchase price is received in our account at the latest on the 7th opening day of our bank after sending the order confirmation to the buyer to his last known e-mail address, if the purchase contract is otherwise terminated. As far as we deliver by cash on delivery, the maturity of the purchase price claim occurs with receipt of the goods. The invoice amount is to be paid in cash upon delivery to the employee of the delivery service carrying out the delivery.
§4 Delivery
(1) After sending the order confirmation (in case of order by cash on delivery) or after receipt of the purchase price on our account (in case of order by cash in advance or by Pay-Pal) we ship by parcel service within 3 working days. If we do not have the ordered item in stock, the buyer will be informed immediately about the delay in delivery. Items not in stock can be delivered in a short time of 5 - 10 working days.
(2) If the buyer has chosen payment in advance or Paypal, we will ship the goods within three working days after receipt of payment.
(3) If we are not able to deliver the ordered goods through no fault of our own because the upstream supplier has not fulfilled its contractual obligations or the goods are no longer available, we are entitled to withdraw from the purchase contract. In this case, we will inform you immediately by e-mail of the withdrawal from the contract. Payments already made will be refunded immediately in the same way. In this case we are not liable for any damages or other claims of the buyer, especially not for delay or consequential damages or lost profits.
§5 Right of withdrawal for consumers
(1) Right of withdrawal
Consumers have a fourteen-day right of withdrawal. A consumer is any natural person who enters into a legal transaction for a purpose that can be attributed neither to his commercial nor to his independent professional activity. The right of withdrawal does not apply to distance contracts for the delivery of goods that are manufactured according to customer specifications.
(2) Cancellation policy
You have the right to cancel this contract within fourteen days without giving any reason. The revocation period is fourteen days from the day on which you or a third party named by you, who is not the carrier, has or has taken possession of the goods or the last goods or the last partial shipment or the last item.
In order to exercise your right of withdrawal, you must inform Mysteel24 e.U. by means of a clear declaration (e.g. a letter sent by post, fax or e-mail) of your decision to withdraw from this contract. You can electronically fill out and submit the model withdrawal form or another clear declaration on our website www.mysteel24.com. If you make use of this option, we will immediately send you (e.g. by e-mail) a confirmation of receipt of such revocation. To comply with the revocation period, it is sufficient that you send the notice of exercise of the right of revocation before the expiry of the revocation period.
The revocation is to be sent to:
Mysteel24 e.U.
Flemingstr. 2
2332 Hennersdorf, Austria
Austria
e-mail: office@mysteel24.com
(3) Consequences of revocation:
If you revoke this contract, we shall reimburse you all payments we have received from you, including delivery costs (with the exception of additional costs resulting from the fact that you have chosen a type of delivery other than the favorable standard delivery offered by us), without undue delay and no later than within fourteen days from the day on which we received the notification of your revocation of this contract. For this repayment, we will use the same means of payment that you used for the original transaction, unless expressly agreed otherwise with you; in no case will you be charged for this repayment. We may refuse repayment until we have received the goods back or until you have provided proof that you have returned the goods, whichever is the earlier. You will only have to pay for any loss in value if this loss in value is due to handling of the goods that is not necessary for testing the quality, characteristics and functioning of the goods.
§6 Contract text
The text of the contract is stored on our internal systems. The current version of the General Terms and Conditions can be viewed on our website at any time. The order data and the general terms and conditions will be sent to you by e-mail. After completion of the order, your order data is no longer accessible via the Internet for security reasons.
§7 Warranty
The statutory warranty provisions apply
§8 Final provisions
The law of the Republic of Austria shall apply to the exclusion of its conflict of law provisions and to the exclusion of the UN Convention on Contracts for the International Sale of Goods.Should any provision of these General Terms and Conditions be or become legally invalid, this shall not affect the validity of the remaining provisions. The invalid provisions shall be replaced by the statutory provisions. The same shall apply insofar as the GTC contain a gap that was not foreseen.All amendments to the contractual documentation, including this clause, must be made in writing in order to be effective.The contractual language is German.Status of the GTC 2015.
DATA PROTECTION DECLARATION MYSTEEL24 e.U.
1. legal basis
1.1 The EU General Data Protection Regulation, the Data Protection Act 2000 and the Data Protection Amendment Act 2018 serve the right to protection of personal data. We process your data exclusively on the basis of the legal provisions (DSGVO, DSG 2018, TKG 2003).
2. basic information
2.1 The responsible person is Fritz Bogner, fbogner@mysteel24.com
2.2 We are particularly concerned to protect and keep safe all personal data that you entrust to us. In this document you will learn more about how we use and process your personal data.
3 Purpose, legal basis, storage period and data recipients
3.1 We require the personal data collected for the purpose of submitting offers, executing orders, delivering and billing for our services. The data is collected, stored, processed and used for this purpose.
3.2 The legal basis for the processing of your personal data are on the one hand contract performance (eg online shopping), legitimate interests, the fulfillment of our legal or contractual obligations and on the other hand your consent (eg contact form, online store, cookies). Failure to provide the data may have different consequences.
3.3 We process your personal data, as far as necessary, for the duration of the entire business relationship (from the initiation, processing to the termination of a contract) as well as beyond that in accordance with the statutory retention and documentation obligations, which result, among other things, from the Austrian Commercial Code (UGB), the Federal Fiscal Code (BAO) as well as until the end of any legal dispute, ongoing warranty and guarantee periods, etc.
3.4 As part of the operation of our websites, we commission software service providers who may gain access to your personal data in the course of their activities, insofar as they require the data to perform their respective services. These service providers have undertaken to comply with the applicable data protection regulations. Order processing contracts have been concluded in accordance with Art 28 DSGVO. You can request more detailed information on the order processors commissioned by us at fbogner@mysteel24.com.
4. contact form
4.1 Your information including personal data from our contact form will be transmitted to us via our own mail server to process your request, processed and stored by us. This data will not be collected or passed on without your consent. Without this data we cannot process your requests.
4.2 The data processing is based on the legal provisions of § 96 para 3 TKG and Art 6 para 1 lit a (consent) DSGVO.
5. newsletter
5.1 You can register for our newsletter on the website.
5.2 We commission order processors to send our newsletter. These have undertaken to comply with the applicable data protection regulations vis-à-vis us. An order processing contract has been concluded in accordance with Art 28 DSGVO. You can request more information about the processors we commission at fbogner@mysteel24.com.
5.3 The data processing is based on the legal provisions of § 96 para 3 TKG and Art 6 para 1 lit a (consent) DSGVO.
6. online purchase
6.1 We would like to point out that for the purpose of simplifying the shopping process and for the subsequent processing of the contract, the IP data of the connection owner are stored by the webshop operator Netgenerator GmbH within the scope of cookies, as well as the name, address and contact data of the buyer. In addition, order information such as articles, quantity, prices, etc. are also stored by us for the purpose of contract processing:. The data provided by you are necessary for the fulfillment of the contract or for the implementation of pre-contractual measures. Without this data, we can not conclude the contract with you.
6.2 A transmission of data takes place to payment service providers for the purpose of debiting the purchase price, to the transport company commissioned by us for the purpose of delivery of the goods, as well as to our tax advisor for the purpose of fulfilling our tax obligations. These companies have undertaken to comply with the applicable data protection regulations vis-à-vis us. An order processing contract has been concluded in accordance with Art 28 DSGVO. You can request more detailed information on the order processors commissioned by us at fbogner@fixmetall.at.
6.3 Data processing is carried out on the basis of the legal provisions of § 96 Abs 3 TKG as well as Art 6 DSGVO (in particular consent and/or the need to fulfill the contract).
7 Cookies, other tracking tools and web analysis
7.1 Cookies, other tracking technologies as well as functions of the web analysis service Google Analytics can be used on our internet platform in various ways. Cookies are small pieces of text information that make it possible to recognize the user and analyze your use of our websites. The information thus generated is transferred to the provider's server and stored there. They are used to make our website more user-friendly, more effective and more secure. In addition, cookies are used to measure the frequency of page views and for general navigation.
7.2 By using our website, you consent to our setting cookies. You can refuse the acceptance of cookies in your browser settings. Please refer to the instructions of your browser manufacturer for details on how this works. If you decide against certain technical and/or functional cookies, the functionality of our website could possibly be limited. Some cookies remain stored on your terminal device until you delete them.
7.3 We have concluded a corresponding contract for commissioned data processing with the provider. They have undertaken to comply with the applicable data protection regulations vis-à-vis us. You can request more information about the order processors we have commissioned at fbogner@mysteel24.com.
7.4 Your IP address is recorded, but immediately pseudonymized [e.g. by deleting the last 8 bits]. This means that only a rough localization is possible.
7.5 The data processing is based on the legal provisions of § 96 Abs 3 TKG and Art 6 DSGVO (in particular consent). Since the privacy of our users is important to us, the user data is pseudonymized.
8 Consent and right of revocation
8.1 If your consent is required for the processing of your data, we will only process it after your express consent.
8.2 In principle, we do not process data of minors and are not authorized to do so. By giving your consent, you confirm that you have reached the age of 14 or that you have the consent of your legal representative.
8.3 You can revoke your consent at any time at the following e-mail address: fbogner@mysteel24.com. In such a case, the data previously stored about you will be anonymized and subsequently used only for statistical purposes without reference to persons. By means of the revocation of consent, the lawfulness of the processing carried out on the basis of the consent until the revocation is not affected.
9 Data security
9.1 Mysteel24 e.U. uses technical and organizational security measures in order to protect the stored personal data against accidental or intentional manipulation, loss or destruction and against access by unauthorized persons. Our security measures are continuously improved in accordance with technical progress.
10. your rights
10.1 You have the right to information from the responsible Fritz Bogner, fbogner@mysteel24.com about the personal data concerned at any time. Insofar as there is no legal obligation to retain the data, you have the right to have this data deleted and to object to the processing. Furthermore, you have the right to correct the data as well as to restrict the processing, to data portability as well as to lodge a complaint with the Austrian Data Protection Authority (Wickenburggasse 8-10, 1080 Vienna, e-mail: dsb@dsb.gv.at).
10.2 Please contact us regarding your rights at fbogner@mysteel24.com or write to: Mysteel24 e.U., Fritz Bogner, Data Protection Officer.
Fritz Bogner
Flemingstr. 2
2332 Hennersdorf
Austria
fbogner@mysteel24.com